File
Dorman Long & Co. Ltd. - Technical Drawing/Plan of Sydney Harbour Bridge: Alternative...
Catalogue reference: BS/DL/6/6/1/115/15
What’s it about?
This record is a file about the Dorman Long & Co. Ltd. - Technical Drawing/Plan of Sydney Harbour Bridge: Alternative....
Access information is unavailable
Sorry, information for accessing this record is currently unavailable online. Please try again later.
Full description and record details
-
Reference (The unique identifier to the record described, used to order and refer to it)
- BS/DL/6/6/1/115/15
-
Title (The name of the record)
- Dorman Long & Co. Ltd. - Technical Drawing/Plan of Sydney Harbour Bridge: Alternative "B" Cantilever Arch Bridge, Main Trusses & Lateral Bracing, Total Stresses & Material Diagram
-
Description (What the record is about)
-
Drawing No. B.2
-
Held by (Who holds the record)
- Teesside Archives
-
Legal status (A note as to whether the record being described is a Public Record or not)
- Not Public Record(s)
-
Physical description (The amount and form of the record)
- 1 drawing
-
Record URL
- https://beta.nationalarchives.gov.uk/catalogue/id/f1bb1065-1dac-46f7-a8de-6c39459b9665/
Series information
BS/DL/6
Dorman Long & Co. Ltd. - Operational Records
See the series level description for more information about this record.
Catalogue hierarchy
This record is held at Teesside Archives
Within the fonds: BS/DL
Dorman Long and Company Limited Collection
Within the series: BS/DL/6
Dorman Long & Co. Ltd. - Operational Records
Within the sub-series: BS/DL/6/6
Dorman Long & Co. Ltd. - Technical Drawings/Plans
Within the sub-sub-series: BS/DL/6/6/1
Dorman Long & Co. Ltd. - Bridges and Buildings
Within the sub-sub-sub-series: BS/DL/6/6/1/115
Dorman Long & Co. Ltd. - Technical Drawings/Plans of Sydney Harbour Bridge
You are currently looking at the file: BS/DL/6/6/1/115/15
Dorman Long & Co. Ltd. - Technical Drawing/Plan of Sydney Harbour Bridge: Alternative "B" Cantilever Arch Bridge, Main Trusses & Lateral Bracing, Total Stresses & Material Diagram