Skip to main content
Service phase: Beta

This is a new way to search our records, which we’re still working on. Alternatively you can search our existing catalogue, Discovery.

Series

Grenfell Tower Inquiry: Scale Model of Façade

Catalogue reference: GTI 6

What's it about?

GTI 6

This series contains a physical scale model of the as-built condition of a typical bay of the external façade of Grenfell Tower made for and used by the Grenfell Tower Inquiry. The model was fabricated by Pipers Model Makers under instructions...

Full description and record details

Reference
GTI 6
Title
Grenfell Tower Inquiry: Scale Model of Façade
Date
2020
Description

This series contains a physical scale model of the as-built condition of a typical bay of the external façade of Grenfell Tower made for and used by the Grenfell Tower Inquiry.

The model was fabricated by Pipers Model Makers under instructions from expert witness Paul Hyett. It was designed to show a typical bay of the tower, but specifically where the fire started. It also illustrates the building façade at different stages:

  • Stage 1: Showing the original concrete façade-treatment
  • Stage 2: Showing the new façade treatment/cladding installed, from surveys carried out onsite
  • Stage 3: How the cladding should have been installed onto the building façade

The model has a number of parts, as it is modelled accurately to show each stage. These can be simplified into the following categories:

  • Original concrete façade
  • Hanging brackets and insulation
  • Aluminium panels

The model was referred to in evidence on 2 November 2020 (day 63 of the Inquiry). The following documents and instructions relating to the model were published in evidence: PHY0000001.pdf, PHY0000002.pdf, PHY0000003.pdf, PHY0000004.pdf, PHY0000005.pdf, PHY0000006.pdf and PHY0000007.pdf.

Held by
The National Archives, Kew
Legal status
Public Record(s)
Language
English
Creator(s)
Grenfell Tower Inquiry, 2017-2024
Physical description
1 artefact(s)
Access conditions
Open
Immediate source of acquisition

In 2024 Grenfell Tower Inquiry

Accruals
No further accruals are anticipated.
Selection and destruction information
The whole model has been selected for permanent preservation according to the direction and wishes of the inquiry chairman.
Administrative / biographical background

This physical scale model was made to support the Inquiry's understanding of how the fire spread and its effects. It formed an important part of the evidence considered by the Inquiry.

Record URL
https://beta.nationalarchives.gov.uk/catalogue/id/C19627772/

Catalogue hierarchy

Over 27 million records

This record is held at The National Archives, Kew

516,596 records

Within the department: GTI

Records of the Grenfell Tower Inquiry

You are currently looking at the series: GTI 6

Grenfell Tower Inquiry: Scale Model of Façade