Skip to main content
Service phase: Beta

This is a new way to search our records, which we're still working on. Alternatively you can search our existing catalogue, Discovery.

File

Great Eastern Railway. Improvement of Ely and Norwich line, Occupation Road Crossing...

Catalogue reference: Q/RUm/83

What’s it about?

This record is a file about the Great Eastern Railway. Improvement of Ely and Norwich line, Occupation Road Crossing....

Access information is unavailable

Sorry, information for accessing this record is currently unavailable online. Please try again later.

Full description and record details

Reference
Q/RUm/83
Title
Great Eastern Railway. Improvement of Ely and Norwich line, Occupation Road Crossing and Additional Lands at Whittlesford, Wisbech, March and Ely.
Description

Description:

1. Improvement of the Ely and Norwich line from Ely Station to Ely Junction, Isle of Ely.

2. Stopping up of Occupation Road Crossing near Great Shelford Station.

3. Additional lands adjoining Whittlesford Station.

4. Additional lands adjoining Wisbech Station near the River Nene.

5. Additional lands adjoining March Station.

6. Additional lands adjoining Ely Station.

7. Line of pipe from the River Nene to the engine shed, Peterborough Station. [Plan only].

8. Additional land at Somersham (co. Huntingdon) Station.

Passing through the following parishes:

1. Ely, St. Mary (co. Cambridgeshire).

2. Great Shelford (co. Cambridgeshire).

3. Duxford (co. Cambridgeshire).

4. Wisbech St. Peter and Leverington (co. Cambridgeshire).

5. Hamlet of March, (in the parish of Doddington- co. Cambridgeshire).

6. Parishes of St. Mary and Holy Trinity, in Ely (co. Cambridgeshire).

7. Fletton, Hunts

8. Somersham, Hunts

Comprising:

- Plans and sections. 7 sheets, each 22 x 30.

- Book of reference.

- Ordnance Survey sheet, scale: 1 inch to 1 mile.

- Printed summary of bill.

Scales:

1. Plan and section: Horizontal 2 chains (44 yards) to 1 inch; Vertical 20 feet to 1 inch.

2. Plan: 1 chain (22 yards) to 1 inch.

3. Plan: 1 chain (22 yards) to 1 inch.

4. Plan: 2 chains (44 yards) to 1 inch.

5. Plan: 1 chain (22 yards) to 1 inch.

6. Plan: 2 chains (44 yards) to 1 inch.

7. Plan and section: Horizontal 1 chain (22 yards) to 1 inch; Vertical 33 feet to 1 inch.

8. Plan: 2 chains (44 yards) to 1 inch.

Engineer: Alfred A. Langley.

Held by
Cambridgeshire Archives
Language
English
Immediate source of acquisition

Plan deposited 30 November, 1876.

Record URL
https://beta.nationalarchives.gov.uk/catalogue/id/4099e485-572c-4a05-acca-20263d255ed8/

Series information

Q/RUm

Public Utility Plans

See the series level description for more information about this record.

View series description

Catalogue hierarchy

32,664 records

This record is held at Cambridgeshire Archives

502 records

Within the fonds: Q

CAMBRIDGESHIRE: QUARTER SESSIONS RECORDS

466 records

Within the sub-fonds: Q/R

ENROLMENT, REGISTRATION AND DEPOSIT

162 records

Within the series: Q/RUm

Public Utility Plans

You are currently looking at the file: Q/RUm/83

Great Eastern Railway. Improvement of Ely and Norwich line, Occupation Road Crossing and Additional Lands at Whittlesford, Wisbech, March and Ely.