Skip to main content
Service phase: Beta

This is a new way to search our records, which we're still working on. Alternatively you can search our existing catalogue, Discovery.

Fonds

DONCASTER LOCOMOTIVE WORKS ARCHIVE; PART 1: DRAWING OFFICE RECORDS

Catalogue reference: GB 756 2000-7200

What’s it about?

This record is about the DONCASTER LOCOMOTIVE WORKS ARCHIVE; PART 1: DRAWING OFFICE RECORDS dating from 1850 - 1968.

Is it available online?

Maybe, but not on The National Archives website. This record is held at Search Engine (National Railway Museum).

Can I see it in person?

Not at The National Archives, but you may be able to view it in person at Search Engine (National Railway Museum).

Full description and record details

Reference

GB 756 2000-7200

Title

DONCASTER LOCOMOTIVE WORKS ARCHIVE; PART 1: DRAWING OFFICE RECORDS

Date

1850 - 1968

Description

The material consists of c. 13,000 drawings, and 100 registers and schedules.

The drawings relate to the construction of London and North Eastern locomotives with occasional drawings from other railway companies and constructors. Most of the drawings are on linen. The majority is in a reasonably good condition but a number have the remains of decaying sticky tape attached.

Each drawing has a letter code and a number. The letter code runs from 'A' through to 'Z' and each section covers a group of related locomotive parts. The contents of the letter-coded sections are detailed at the beginning of the drawings list.

The drawings within each letter-coded section run in sequence from I. There is a great variation in the size of the sections, some having only a few hundred drawings and some having more than a thousand. Some drawings have more than one part; a few drawings have over a hundred parts to them.

Each drawing may include the drawing title, date of drawing, tracing and checking, and details of locomotive class or type, order numbers, dates, additional information and numbers of related drawings. Many drawings are signed by the Chief Mechanical Engineer.

There is no complete run of drawing registers. The registers and lists comprise parts of sequences of drawings and lists of drawings for certain specific locomotives or types of locomotives. More work is required to determine dates of compilation and the scope of this material.

Arrangement

The drawings are arranged in drawing order number within each alphabetically labelled section.

The registers are arranged in following sub-classes:-

Main drawing register series (Inventory numbers GB 756 2000-7200 to 2000-7211)

Rough drawing register series (Inventory numbers GB 756 2000-7212 to GB 756 2000-7228)

Schedules i.e. lists of drawings for a distinct class of locomotive (Inventory numbers GB 756 2000-7229 to GB 756 2000-7286)

Miscellaneous lists, including carriage and wagon drawing registers (Inventory numbers GB 756 2000-7287 to GB 756 2000-7299)

Held by
Search Engine (National Railway Museum)
Language

English

Creator(s)
<corpname>London and North Eastern Railway Company, 1923-1947</corpname>
Access conditions

The condition of the drawings and registers and lists is very variable. Whether or not original material will be made available for use or copying depends on its condition, size and copyright restrictions.

Immediate source of acquisition

This material formed part of the British Transport Commission's collections formerly housed at the Museum of British Transport, Clapham. It was transferred to the National Railway Museum in 1975 under the terms of the 1968 Transport Act.

Physical condition

The condition of the drawings is very variable: some are very fragile, faded and torn.

Custodial history

Inventory numbers drawings 2000-7304

Inventory numbers registers etc 2000-7200 to 2000-7299

Catalogue version 2.1 March 2000

© Trustees of the Science Museum 2000

Version 2.0 Modified to include microfilmed drawings by Julia Hudson, Archives Assistant

Version 1.0 This catalogue was compiled by MF Berry, Assistant Curator Archive Collections at the National Railway Museum, based on work carried out by R Durack, I Watson, J Peck, A1 Locomotive Trust, A Makepeace, D Huntington, V Lawlor, E Atkinson over the period 1994 - 2000

The archive is the property of the Trustees of the Science Museum.

Selection and destruction information

No appraisal or destruction work on the archive has been carried out by either the Museum of British Transport or the NRM. The archive as catalogued is that transferred to the BTC from British Railways. However, anecdotal evidence from former railway employees indicate that significant quantities of drawings were disposed of whilst the archive was still at Doncaster Works. None of the sections has a complete run of drawings.

Administrative / biographical background

ADMINISTRATIVE HISTORY OF DONCASTER LOCOMOTIVE WORKS

Doncaster locomotive works was built for the Great Northern Railway and became one of the principal locomotive works of the LNER in 1923. Doncaster was chosen because of its proximity to large coalfields, centres of iron-founding and good water communications. The works became known to generations of railway workers by its nickname "The Plant".

1852 March Works tendered for and built by G & A Holme.

1853 July Approximately 500 men were transferred to Doncaster from temporary repair accommodation at Boston

1853 Dec Number of employees rose to 950. The original works covered 11 acres including 5 acres of covered shops but there was an almost continuous process of extension throughout the next 130 years.

1854 Original smithy was extended.

1866 Existing erecting shops extended to provide for the construction of new locomotives which until then had been purchased from private builders. Gas plant was built to supply the works.

1881 Gas plant extended and iron foundry built.

1882 New boiler shop built

1890- One new erecting shop and additional machine shop added

1891 c. 3500 men employed in the locomotive and wagon works at Doncaster; 300 locomotives, 3735 carriages and 15,226 wagons passed through for repair and 99 new locomotives 181 new carriages and 1493 new wagons were built.

1907 Drop stamps installed and boiler shop extended.

1910, 1913 Electric generating equipment was modernised.

1923 London & North Eastern Railway was created, the second largest of the "Big Four" group of companies established by the Railway Act, 1921. It had the largest number of main works, from Inverurie in the north of Scotland to Stratford in the east end of London. LNER had four main locomotive works headed by a Mechanical Engineer who as well as running the locomotive works and C & W works also controlled the functions of the CME's department within his area including maintenance of outdoor machinery and electrical services and provision of technical stores. LNER works retained greater autonomy within the company than was the case on the other three railways.

1923 Resignation of Sir Vincent Raven, North Eastern Railway, retained for one year by LNER as advisor. Appointment of Nigel Gresley, formerly CME of the GNR, as Chief Mechanical Engineer for the company.

1927 R A Thom appointed Mechanical Engineer, Gorton and later at Doncaster. O S Bulleid appointed Assistant to Chief Mechanical Engineer

1935 New engine weigh-house built

1936 Central air compressor station built

1941 Death of Sir Nigel Gresley, Chief Mechanical Engineer. Edward Thompson appointed to replace Gresley

1946 Arthur H Peppercorn, Chief Mechanical Engineer, until 1947

1948 Nationalisation

1957 October Last of over 2200 steam locomotives built at Doncaster left the works in at which time, work switched to the construction of diesel-electric locomotives

1947 c. 3185 staff members were employed and 7 new locomotives were built, 582 heavy repairs and 156 light repairs were carried out.

1962 Works modernised as part of the main works rationalisation plan arising from the formation of British Railways Workshops division. The diesel locomotive repair shop was the largest shop in the works with other sections for the repair of power units, train heating boilers, traction motors, generators and ancillary equipment. At this time the works was devoted entirely to the overhaul and repair of diesel main -line and shunting locomotives.

Publication note(s)
<span class="wrapper"><p>Further details about the history and development of GNR, LNER and railway workshops are available in various printed sources, such as:-</p> <p>Allen Cecil J., The London &amp; North Eastern Railway, Ian Allen 1966</p> <p>Bonavia, Michael R., British Rail - The First 25 Years, David &amp; Charles 1981</p> <p>Grinling, Charles H., The History of the Great Northern Railway, George Allen 1966</p> <p>Larkin, Edgar J. and John G., The Railway Workshops of Britain 1823 - 1986, Macmillan 1986</p> <p>Various Authors, Round The Works Of Our Great Railways, Edward Arnold, 1893</p> <p>Wrottesley, John, The Great Northern Railway, Vol 1 Origins &amp; Development, Batsford 1979</p> <p>Bagwell, Philip S., Doncaster: Town of Trainmakers 1853-1990, 1991</p></span>
Record URL
https://beta.nationalarchives.gov.uk/catalogue/id/1bb7f4fa-f0b6-43b8-b52f-3a52917cd637/

Catalogue hierarchy

17,455 records

You are currently looking at the fonds: GB 756 2000-7200

DONCASTER LOCOMOTIVE WORKS ARCHIVE; PART 1: DRAWING OFFICE RECORDS