Skip to main content
Service phase: Beta

This is a new way to search our records, which we're still working on. Alternatively you can search our existing catalogue, Discovery.

File

Poldice No. 2, Middle or Western Engine, 1780, 1781, 1783

Catalogue reference: MS 3147/5/1296

What’s it about?

This record is a file about the Poldice No. 2, Middle or Western Engine, 1780, 1781, 1783 dating from 1780 - 1783.

Access information is unavailable

Sorry, information for accessing this record is currently unavailable online. Please try again later.

Full description and record details

Reference
MS 3147/5/1296
Title
Poldice No. 2, Middle or Western Engine, 1780, 1781, 1783
Date
1780 - 1783
Description

Cornish Mine Engines (21 items).

1296. Poldice No. 2, Middle or Western. Apr., May 1780, Apr., Jun., Nov. 1781, Jan. 1783. 21 items.
Single-acting engine, with 63 inch cylinder, 9 foot stroke, chain connection.

General view of the engine, outside front view of the engine and outside end view of the boiler, inside front view of the engine and longitudinal and cross-sections of the boiler, ground plan of the engine and boiler - original and reverse drawings; sections and plan of the boiler - reverse drawing; eduction pipe - reverse drawing marked "…the proper drawing…"; martingales, glands, catch pins, piston rod cap etc.; eduction pipe; longitudinal and cross-sections of boiler seating ("setting") - original and reverse drawings; balance bob; gudgeon and plummer block; flanch for 17 inch plain pipes (with flanches for Wheal Virgin boiler steam pipes on the same sheet).
Also the following later items: clack door piece - partially coloured original and partially coloured reverse drawings marked "These drawings were made for Poldice but afterwards altered", Jan. 1783.

Original Portfolio or 'Book' No. 11. Catalogue of Old Engines p. 300.

For Poldice Mine. This was the second engine for Poldice [see Portfolio 5/1286 for the first], and was referred to as the "Middle" or "Western" engine. According to the List of Engines made at Soho, it was stopped in Aug. 1795. It lay idle in 1796 before being moved to Pednandrea Mine, where it started in Oct. 1797 and where it was still at work in May 1798.
At some point 6 original drawings (the general view, outside and inside front views, ground plan and longitudinal and cross-sections of the boiler seating) were removed from this portfolio, for reference or display. They were not replaced, but placed in Box 2 of "Miscellaneous Drawings", where they were found in Feb. 2002.

Held by
Birmingham: Archives, Heritage and Photography Service
Record URL
https://beta.nationalarchives.gov.uk/catalogue/id/19f18c12-b69a-46c6-add3-970e4510bdc1/

Series information

MS 3147/5

DRAWINGS - MAIN SERIES

See the series level description for more information about this record.

View series description

Catalogue hierarchy

211,607 records
23,824 records

Within the fonds: MS 3147

Boulton and Watt Collection

9,561 records

Within the sub-fonds: MS 3147/3

Correspondence and Papers

1,725 records

Within the series: MS 3147/5

DRAWINGS - MAIN SERIES

1,542 records

Within the sub-series: MS 3147/5/169

Walker Colliery, Newcastle upon Tyne

You are currently looking at the file: MS 3147/5/1296

Poldice No. 2, Middle or Western Engine, 1780, 1781, 1783